Thanks for your answer! My first problem has been solved. Now I have a different problem. After the routing, I want to calculate delay of the specific path in the design. I know that I can do this from SDF file and calculate sum of the delays of the cells plus nets of that path. But I want to do this faster than this way. Is there a way to do this faster? Regards Milad
↧